Availability: | |
---|---|
Quantity: | |
Spiral welded pipe
SSAW spiral welded pipe is made of strip steel coil as raw material, extruded at normal temperature and welded by automatic double-wire double-sided submerged arc welding process, which has high compressive strength, high impact strength, high safety performance and long service life. Outside Diameter OD: 219mm-3500mm Wall Thickness: 1.5mm-25mm Length: 3-18M Surface: Bare, Lightly Oiling, Black Painting, Anti-corrosion Coating (FBE / 2PE / 3PE)
Product Paramenters
Product Name | Spiral steel pipe | |
Standard | GB,AISI,ASTM,DIN,EN,SUS,UNS,JIS API 5L, API 5CT | |
Grade | Gr.B Q195-Q345 S275, S275jr, st37,etc | |
Material | API A106 GR.B A53 304 X42-X80, L175-L555,L245NB, etc. | |
Thickness | 1.0-25mm | |
Length | 12m, 6m, 1-12m or customized | |
Surface | Smooth and neat surface, no burrs and no pits | |
Pipe Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. | |
Certificate | CE, BIS, SGS, ISO9001 | |
Testing Methods | Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and | |
physical property inspection | ||
Packaging | Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; | |
Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk; | ||
Also according to customer's requests | ||
Origin | Shandong,China | |
Quantity | 10,000 tons per month | |
Application | Conveying oil gas and water | |
Third Party Inspection | SGS BV MTC | |
Trade Terms | FOB,CIF,CRF | |
Payment Terms | FOB: 30%T/T,70% before shipment | |
CIF: 30% pre-payment and the balance to be paid before making shipment | ||
or Irrevocable 100% L/C at sight | ||
Delivery Time | Usually within 15-20 days after receipt of advance payment |
Product Display
Products Are Widely Used
Packaging & Shipping
1. Package with 20 ft or 40 ft container, fixing spiral steel pipe in the container with steel cable;
2. Package in bulk;
3. Pieces per container depending on the diameter of spiral steel pipes.
4.According to customers' requirement.
Certifications
FAQ
Q1: Are you trading company or manufacturer ?
A1: We are factory.
Q2: How long is your delivery time?
A2: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A3: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What is your terms of payment ?
A4: 30% T/T in advance ,balance before shippment or L/C at sight.
Spiral welded pipe
SSAW spiral welded pipe is made of strip steel coil as raw material, extruded at normal temperature and welded by automatic double-wire double-sided submerged arc welding process, which has high compressive strength, high impact strength, high safety performance and long service life. Outside Diameter OD: 219mm-3500mm Wall Thickness: 1.5mm-25mm Length: 3-18M Surface: Bare, Lightly Oiling, Black Painting, Anti-corrosion Coating (FBE / 2PE / 3PE)
Product Paramenters
Product Name | Spiral steel pipe | |
Standard | GB,AISI,ASTM,DIN,EN,SUS,UNS,JIS API 5L, API 5CT | |
Grade | Gr.B Q195-Q345 S275, S275jr, st37,etc | |
Material | API A106 GR.B A53 304 X42-X80, L175-L555,L245NB, etc. | |
Thickness | 1.0-25mm | |
Length | 12m, 6m, 1-12m or customized | |
Surface | Smooth and neat surface, no burrs and no pits | |
Pipe Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. | |
Certificate | CE, BIS, SGS, ISO9001 | |
Testing Methods | Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and | |
physical property inspection | ||
Packaging | Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; | |
Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk; | ||
Also according to customer's requests | ||
Origin | Shandong,China | |
Quantity | 10,000 tons per month | |
Application | Conveying oil gas and water | |
Third Party Inspection | SGS BV MTC | |
Trade Terms | FOB,CIF,CRF | |
Payment Terms | FOB: 30%T/T,70% before shipment | |
CIF: 30% pre-payment and the balance to be paid before making shipment | ||
or Irrevocable 100% L/C at sight | ||
Delivery Time | Usually within 15-20 days after receipt of advance payment |
Product Display
Products Are Widely Used
Packaging & Shipping
1. Package with 20 ft or 40 ft container, fixing spiral steel pipe in the container with steel cable;
2. Package in bulk;
3. Pieces per container depending on the diameter of spiral steel pipes.
4.According to customers' requirement.
Certifications
FAQ
Q1: Are you trading company or manufacturer ?
A1: We are factory.
Q2: How long is your delivery time?
A2: Generally it is 10-20 days if the goods are in stock. or it is 20-30 days if the goods are not in stock, it is according to quantity.
Q3: Do you provide samples ? is it free or extra ?
A3: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What is your terms of payment ?
A4: 30% T/T in advance ,balance before shippment or L/C at sight.
content is empty!